Suspended Scaffold on the bow of a massive oil tanker.
Suspended Scaffold for inspection of a Bridge.
A Engineer Design Tower constructed by our crew on a tight schedule. (10 days completion)
A tower completed in 2018. Great Crew!
Steel decks for your next project.
A Suspended scaffold recently completed. (2020)
Lines are down for the swing stage on this Stack.
Multi bay scaffold set up for a Concert.
Stack Access
When you need 9 lights changed, 110 feet from the floor, we send our Tactical Access Team.
If you need access to your complex roof, call us!
A residential project we are proud to be part of.
Corner swing stage set up for window replacement downtown St John's NL.
Rope access demonstration
Preparing swing stage for installation.
Stair towers installed for Nexans Norway on the 2016 SOBI Project.
Stair Tower complete for Nexans Norway 2016 SOBI Project.
Cantilevered Suspended Scaffold for inspection.
2016 St John's Santa Parade.
Boarding An Oil Tanker, just another place we install scaffolding.
Stair towers under construction for Nexans Norway 2016 SOBI Project. Location: Forteau Point, Labrador.
Equipment we have available for your project. 6000LB Telehandler.
Cantilevered, Suspended Scaffold at Placentia Lift Bridge. (Under Construction)
Scaffold towers downtown St John's.
Scaffold for access to lights at Mt. Pearl Summit Centre.
Scaffolding and tarps installed at Quality Hotel.
Swing Stage installed at Cabot Place to change a damaged window.
Scaffold enclosure at Twillingate Long Point Lighthouse.
Loading out for a project
East Bound Hoedown scaffold addition to the stage.
Exterior Building Reno
Access to the facade
Access stair tower
Exterior building reno on Water Street
Hanging scaffold access to the port side
Scaffolding demonstration in Las Vegas 2014
Access to curtain walls at MUN University
Safe Access
Access to tank in water treatment plant
Performance Stage